Project Features
- Transforming Traditional In-situ Construction
- Station Modules to be Assembled with High Level of Completeness at the Worksite 30m away from the Operating Viaduct
- Skidding with Pinpoint Precision
Why Mega Skidding
Innovation and Technology
The Hung Shui Kiu Station is to be built on an operating railway viaduct, with both narrow physical space and time window for construction. To mitigate the potential risk and service impact caused by construction works on the Tuen Ma Line, the project team has proactively applied innovative thinking and advanced technologies. Following a comprehensive review and benchmarking of proven and effective construction solutions worldwide, the team has identified and adopted the optimal construction method – Mega Skidding.
Project Status
Environment
The Corporation attaches great importance to environmental protection throughout the design and construction of railway projects. Every effort is to minimise the project’s impact on the surrounding environment while ensuring compliance with relevant statutory requirements.
During construction, regular monitoring such as noise and air quality monitoring will be conducted in the vicinity of the works sites to ensure compliance with relevant environmental requirements.
Please click here to view the regular monitoring data and monthly reports.